St Paul’s School needed Science Laboratory refurbishment
St Paul’s School needed their Science Laboratory refurbished over Summer 2022. Their Labs had not been changed for about 30 years, so they needed to be modernised and given a complete overhaul.
They required newly fitted work benches and also loose furniture and separate flooring for a theory area, which although connected to the lab needed to be clearly ‘zoned’.
New ceilings were required as well as complete decoration throughout. The school also required a high-quality and durable solution to stand the test of time.

30-Year-Old Lab Overhaul
Theory Area Zoning

Durable Modernisation Requirements


Island Work Benches with Trespa Work Tops

Island Work Benches with Trespa Work Tops

Island Work Benches with Trespa Work Tops

Island Work Benches with Trespa Work Tops

Island Work Benches with Trespa Work Tops

Island Work Benches with Trespa Work Tops
St Paul’s School

Education
How Brookhouse refurbished St Paul’s School Science Laboratory
BrookhouseUK created a design which gave St Paul’s precisely what they needed in terms of practicality, but was also sleek and stylishly modern whilst staying within their budget. Our soft-close hardware with its 25-year warranty quickly satisfied the quality they required.
The new fixed work benches with Trespa worktops ensured that practical lessons could now be carried out in a much more organised fashion, whilst the theory area enabled whole classes to do their theory work together.
Purple stools, chairs and storage trays added a flash of colour against the modern shades of grey for the flooring and cabinetry. The school received the finished lab well and ensured a future-proofed room for years to come.