EF Academy needed a new Science Area
The academy needed a full redesign and refurbishment of the science area comprising of 3 classrooms and a prep room. They needed the installation completed within a tight timeframe over the school Christmas holidays, to open in time for the new year's term.

Moving Doorways & Window Locations
Creating a larger teaching space by moving walls

Christmas holiday working to complete for the new calendar year.


Interior Design & Space Planning

Interior Design & Space Planning

Interior Design & Space Planning

Interior Design & Space Planning

Interior Design & Space Planning

Interior Design & Space Planning

Education
How Brookhouse helped EF Academy Enable Success
We transformed the space by reconfiguring doorways and walls, installing new doors and openings, and repositioning windows to maximise natural light. This created a brighter, more functional teaching environment. Our team completed the extensive work over the Christmas holidays, ensuring the space was ready for the new term without disrupting the school’s schedule.
The result exceeded expectations. The school was so pleased that they held a ribbon-cutting ceremony and invited us to celebrate. They even filmed a walkthrough, with the principal interviewing us in each room to showcase the transformation.