Lichfield Cathedral School needed a science lab refurbishment that needed to be completed within a tight summer schedule.
Lichfield Cathedral School needed to transform a general-purpose classroom into a fully equipped science lab to enhance their science curriculum. The project had to be completed within the summer break, meaning careful planning and scheduling were essential to ensure timely delivery without disrupting the school calendar.

Late project approval affecting scheduling
Limited summer timeframe for completion

Ensuring quality while meeting tight deadlines


Interior Design & Space Planning Optimisation

Interior Design & Space Planning Optimisation

Interior Design & Space Planning Optimisation

Interior Design & Space Planning Optimisation

Interior Design & Space Planning Optimisation

Interior Design & Space Planning Optimisation

Education
How Brookhouse helped Lichfield Cathedral School enable success for their science lab.
We transformed a general classroom into a modern science lab, delivering high-quality fitted furniture and an optimised layout. Despite late project approval causing labour and scheduling challenges, we ensured a high-standard finish that met the school’s needs.