
Oaklands School needed Science Laboratories refurbishment
Oaklands School required the refurbishment of two of their Science Laboratories to accommodate their current and future needs.
This was going to require a completely new layout of each room as the current room plans were not working well, and a more systematised layout was desperately needed so that the pupils were not so spread out.
The new design needed to accommodate the required amount of pupils at any one time whilst giving them enough space to learn effectively. The school required a modern look and feel and an improved environment suitable for science teaching.
Oaklands had unfortunately missed the cut-off for summer work, however they could not wait until the next Summer holidays.

Design and Layout Planning
IPS Panel Installation

Cubicle Partition Installation


3D Design Creation

3D Design Creation

3D Design Creation

3D Design Creation

3D Design Creation

3D Design Creation
Oaklands School

Education
How Brookhouse refurbished the science laboratories of Oaklands School
BrookhouseUK created 3D designs with stylish ‘crescent-shaped work benches for both Labs. The clever shape ensured great positioning for students during lessons so that everyone had good views of the teacher’s interactive screen.
New perimeter workstations with sinks, water, gas taps and double sockets were an essential part of the design. The light grey and white colour scheme helped to provide the right clean and clinical environment for a laboratory – stylish and simplistic.
In order to complete the project as soon as possible, BrookhouseUK started work towards the end Summer holidays to complete the first fix electrical and plumbing works which required access to other classrooms, and then completed the works during term time using the BrookhouseUK term time working methodology.
Oaklands School were delighted with the results, which ensured that the Science Laboratories are future-proofed for the next generations of students.