
Haringey Sixth Form College needed ICT Refurbishment
Haringey Sixth Form College required a fit out for their existing ICT suite. They needed it to be manufactured from a laminate that had been used in other areas of the College and also required updates to their existing benching which had all the cabling exposed and so would create a tidier environment.

Fit out for their existing ICT suite
Updates to their existing benching

Exposed Cabling


Contained cable management

Contained cable management

Contained cable management

Contained cable management

Contained cable management

Contained cable management
Haringey Sixth Form College

Education
How Brookhouse managed exposed cables and laminate the space
BrookhouseUK designed a system which had contained cable management. Both the perimeter benching and table tops were 36mm thick, manufactured with a bespoke concrete effect laminate. Along with this, we specified a sleek polypropylene chair which complimented the design.